Guardian Product Line Tips & Installation Documents

BATTERY > SOLAR > LOAD!
We’ve found that a large number of issues with Guardian board installation/operation can be resolved by removing the three red 10V fuses and re-installing them in the following order:
1. Battery 2. Solar 3. Load. - - This ensures that the system components are receiving power in the safest, most effective order when powering back up.


DC guardian install guide
AC GUARDIAN INSTALL GUIDE

Need additional help? Call us at 800.782.8721.